We believe that the Wi System will be the predominant method of strengthening masonry panels in the future.

Smart Crosby
Consulting Engineers

The Wi System made perfect sense for the complicated masonry walls on the 2012 Aquatics Centre. The Olympic Delivery Authority’s ‘Innovation Champion’ loved it!

Buro Happold
Consulting Engineers

A great improvement in the productivity of block laying where it is not handicapped by the installation of windposts and working around them. We would look to use the Wi System wherever practical.

BAM Construction
Main Contractor

We are convinced that the Wi System was the only solution for this engineering project.

Kier Major Projects

It’s just a simple system of ordinary old blocks and rebar with a few bespoke connectors, yet the testing shows that it’s ridiculously strong.

Lucideon
Lucideon

Wembley Innovation now has major blockwork manufacturers biting [its] hand off to produce and market the system under their own name.

Building.co.uk
Building.co.uk

The Wi System will be extolled to the extent that anything else may be rejected. Watch this space!

London Underground
London Underground

Thanks to an innovative brickwork reinforcement method from London specialist brickies, Pyramid Builders, bays of up to 12 metres in length can be built without windposts or expansion joints, helping to slash costs.

Construction News